The Nuclear Regulatory Commission announced that it is prepared to grant temporary exemptions from work-hour controls when the COVID-19 virus adversely impacts staffing levels at nuclear plants such that the applicant can no longer meet the work-hour control requirements provided that the applicant can demonstrate that fatigue-management controls are in place. Specifically, applicants can email a request seeking exemption from 10 CFR 26.205(d)(1)-(d)(7) to the facility’s NRC project manager from a senior level licensee manager with decision-making authority (with a copy to the NRC Document Control Desk) with the following information:

  • A statement that the licensee can no longer meet the work-hour controls of 10 CFR 26.205(d) for certain positions;
  • A list of positions for which the licensee will maintain current work-hour controls under 10 CFR 26.205(d)(1)-(d)(7);
  • The date and time when the licensee will begin implementing its site-specific COVID-19 PHE fatigue-management controls for personnel specified in 10 CFR 26.4(a);
  • A statement that the licensee’s site-specific COVID-19 PHE fatigue-management controls are consistent with the constraints outlined in this letter and its attachment; and
  • A statement that the licensee has established alternative controls for the management of fatigue during the period of the exemption and that at a minimum, the controls ensure that for individuals subject to these alternative controls:

(1) Not more than 16 work hours in any 24-hour period and not more than 86 work-hours in any 7-day period, excluding shift turnover;

(2) A minimum 10-hour break is provided between successive work periods;

(3) 12-hour shifts are limited to not more than 14 consecutive days;

(4) A minimum of six days off are provided in any 30-day period; and

(5) Requirements are established for behavioral observation and self-declaration during the period of the exemption.

The NRC will consider these requests on a case-by-case basis and will act on them within 60-days.  Additional information can be found here.

About Snell & Wilmer

Founded in 1938, Snell & Wilmer is a full-service business law firm with more than 500 attorneys practicing in 16 locations throughout the United States and in Mexico, including Los Angeles, Orange County and San Diego, California; Phoenix and Tucson, Arizona; Denver, Colorado; Washington, D.C.; Boise, Idaho; Las Vegas and Reno, Nevada; Albuquerque, New Mexico; Portland, Oregon; Dallas, Texas; Salt Lake City, Utah; Seattle, Washington; and Los Cabos, Mexico. The firm represents clients ranging from large, publicly traded corporations to small businesses, individuals and entrepreneurs. For more information, visit swlaw.com.

©2024 Snell & Wilmer L.L.P. All rights reserved. The purpose of this publication is to provide readers with information on current topics of general interest and nothing herein shall be construed to create, offer, or memorialize the existence of an attorney-client relationship. The content should not be considered legal advice or opinion, because it may not apply to the specific facts of a particular matter. As guidance in areas is constantly changing and evolving, you should consider checking for updated guidance, or consult with legal counsel, before making any decisions.
Media Contact

Olivia Nguyen-Quang

Associate Director of Communications
media@swlaw.com 714.427.7490